I hauled most of them out onto the patio. Here are the piles. I think I still have one more box.
It's come to the point where I have piles of scrap woods and No clean space to work on. Moving piles of scraps back and forth from the table saw to the router to the jointer to be able to use one tool
And jigs I made, test joints and little assemblies that look too cool to dump
I think I need to toss out 2/3 of this at least.
Anyone else have this problem? What do you do about it? Scrap bin organizer?
It's come to the point where I have piles of scrap woods and No clean space to work on. Moving piles of scraps back and forth from the table saw to the router to the jointer to be able to use one tool
And jigs I made, test joints and little assemblies that look too cool to dump
I think I need to toss out 2/3 of this at least.
Anyone else have this problem? What do you do about it? Scrap bin organizer?
Comment