I just picked up the green HF portable DC, I plan on wall mounting it, adding a Cgallery's separator and vent straight outside. The DC probably realistically pulls <400 CFM, but it's replacing a 6.5hp vac that was deafening. I picked up some 4" SD and fittings to start plumbing. There will be 3 gates on a single straight run of about 16'. I should only need to drag hose across the floor for the TS which I pull out to the center of the 20x22 garage.
So here were I need some advice, how much of a impact will mounting the ducts at the ceiling and dropping to gates about 4' high have on removal? The original idea was to plumb straight across at 4', but that will eat a lot of wall space and eliminates the option off adding a branch to the middle of the garage.
With a relatively low powered DC, am I better off keeping things low as I originally planned?
So here were I need some advice, how much of a impact will mounting the ducts at the ceiling and dropping to gates about 4' high have on removal? The original idea was to plumb straight across at 4', but that will eat a lot of wall space and eliminates the option off adding a branch to the middle of the garage.
With a relatively low powered DC, am I better off keeping things low as I originally planned?
Comment