Friday I got 6 yards of base material delivered - some for the pool and some for the dog pen. Saturday I was on load number 8 with the wheelbarrow when my new neighbor came over. He'd had some top soil delivered and wanted to know if I wanted his BIL to bring his tractor over to move my stuff for me when they got done.
After moving it all, the BIL refused any payment.
By about 3:00 Saturday I had the pool base in and leveled, a new floor on the dog run and a new base for the play area. I was way ahead of where I thought I'd be so I got a case of beer and went to finally really meet the new neighbors.

By about 3:00 Saturday I had the pool base in and leveled, a new floor on the dog run and a new base for the play area. I was way ahead of where I thought I'd be so I got a case of beer and went to finally really meet the new neighbors.
Comment