A few weeks (or, now, months) ago, I mentioned that a mold problem forced me to move everything out of my basement... basically Starting Over.
Well, I have finally cleaned/purged to the point that I am now 'Putting It Back Together' (as usual, life kind of got in the way in the meantime)...
So, I am back to thinking about layout again. Any input is appreciated: thoughts/improvements/criticisms/ridicule - I'll take it all!
I basically have a 19'x20' blank slate. The back wall and part of one sidewall are poured concrete foundation (unfinished), with the rest of the walls being unfinished 2x6. I have a utility sink in a little 3.5'x3.5' area under the stairs, one 36" door from the basement, a single 32" exterior door, and double 6' exterior doors.
The current (major) items are:
BT3100 (of course)
Delta AP400 dust collector
Bosch 4212L Miter Saw on MSUV
Craftsman 10" bench bandsaw
Bench drill press
Porter cable pancake compressor (or HF dual compressor), plus hose reel
Craftsman bench/drawers with fixed top-mount vise
Four 2'x4'x6' "modular" shelves
Fixed wall-mounted wood rack
100A subpanel
Things I would like to add one day:
Planer / jointer, drum/disk sander, scroll saw, shop air filter... what else?
Here is the layout with nothing but the 4 2'x4'x6' shelving units (I will post my first shot at a full layout next):
Well, I have finally cleaned/purged to the point that I am now 'Putting It Back Together' (as usual, life kind of got in the way in the meantime)...
So, I am back to thinking about layout again. Any input is appreciated: thoughts/improvements/criticisms/ridicule - I'll take it all!
I basically have a 19'x20' blank slate. The back wall and part of one sidewall are poured concrete foundation (unfinished), with the rest of the walls being unfinished 2x6. I have a utility sink in a little 3.5'x3.5' area under the stairs, one 36" door from the basement, a single 32" exterior door, and double 6' exterior doors.
The current (major) items are:
BT3100 (of course)
Delta AP400 dust collector
Bosch 4212L Miter Saw on MSUV
Craftsman 10" bench bandsaw
Bench drill press
Porter cable pancake compressor (or HF dual compressor), plus hose reel
Craftsman bench/drawers with fixed top-mount vise
Four 2'x4'x6' "modular" shelves
Fixed wall-mounted wood rack
100A subpanel
Things I would like to add one day:
Planer / jointer, drum/disk sander, scroll saw, shop air filter... what else?
Here is the layout with nothing but the 4 2'x4'x6' shelving units (I will post my first shot at a full layout next):
Comment