I have the parts, at least paid for, with the exception of the feeder wire, the conduit, and the hub (both Lowes and Home Depot temporarily out of stock).
While waiting for the needed pieces, I am working on removing everything, including the sheetrock, from the power installation project impacted walls.
The miter saw / mortiser cabinet is still lacking drawers. I am working on that, but for the most part, it's done...
Storage is still a problem, but it is becoming less, and less of an issue...
While waiting for the needed pieces, I am working on removing everything, including the sheetrock, from the power installation project impacted walls.
The miter saw / mortiser cabinet is still lacking drawers. I am working on that, but for the most part, it's done...
Storage is still a problem, but it is becoming less, and less of an issue...
Comment