As I get closer and closer to the point where I can actually install the DC plumbing and move off of one long hose.. I am considering where the best mounting location for the DC ducts is...
I see three options.
#1. Run the duct along the ceiling, and drop to the tool, with the blast gate about halfway down the wall, transitioning to flex hose. The biggest problem I see there is getting to the table saw. How do I deal with getting to the underside of the saw?
#2. Midway down the wall, with a simple Y, then blast gate to flex line... Drop to the floor to go to the TS. The duct on the floor is a tripping hazzard.
#3. On the floor, again, go accross the floor to the TS, again duct on the floor is a tripping hazzard.
What is the best way to deal with this?
I see three options.
#1. Run the duct along the ceiling, and drop to the tool, with the blast gate about halfway down the wall, transitioning to flex hose. The biggest problem I see there is getting to the table saw. How do I deal with getting to the underside of the saw?
#2. Midway down the wall, with a simple Y, then blast gate to flex line... Drop to the floor to go to the TS. The duct on the floor is a tripping hazzard.
#3. On the floor, again, go accross the floor to the TS, again duct on the floor is a tripping hazzard.
What is the best way to deal with this?
Comment