This is my 1st major shop related project.
I have been working on it over a few months as I have had time, but I am pretty happy with the results.
I have attached a link to the photobucket album.
Workshop Album
I have 2 x 4s attacked to the 2 x 6 studs via 6" lag bolts, 4 per vertical member.
There is a footer attached behind the plywood that you cannot see, attached with 4.5" lags at each stud, it is flat against the wall rather than on edge.
There is black iron pipe in 7/8" holes at 5 degrees 2.5 inches deep.
These pipes are surrounded by PVC sleeves.
I have to just make my pivoting plywood rack, but I wanted to take some pics of the current progress.
Thanks for looking, and you engineers, please tell me my wall is not going to collapse
I have been working on it over a few months as I have had time, but I am pretty happy with the results.
I have attached a link to the photobucket album.
Workshop Album
I have 2 x 4s attacked to the 2 x 6 studs via 6" lag bolts, 4 per vertical member.
There is a footer attached behind the plywood that you cannot see, attached with 4.5" lags at each stud, it is flat against the wall rather than on edge.
There is black iron pipe in 7/8" holes at 5 degrees 2.5 inches deep.
These pipes are surrounded by PVC sleeves.
I have to just make my pivoting plywood rack, but I wanted to take some pics of the current progress.
Thanks for looking, and you engineers, please tell me my wall is not going to collapse