It's time to plan some winter projects for the shop and this one is high on the priority list (still didn't get the floor painted - too darn much stuff to move and what do ya do with it for about two days?). Here's my list but my gut tells me that I'm overlooking something. Suggestion if you please.
Chiz
*10' length of table
*removeable fence to enable use of table for layout, etc - this also allows lateral adjustment for tape measure (see below) calibration to blades
*R and L reading tape measures on the fence(s)
*## Maybe ## build the table as a large air cleaner using squirrel cage fan and low micron furnace filters (haven't worked this one through, yet)
*Plum in dust collection to both saws
*More light over table
*Strategically positioned T-slots for mounting
hold-downs or mitre jigs.
*Stop block on the fence
Chiz
*10' length of table
*removeable fence to enable use of table for layout, etc - this also allows lateral adjustment for tape measure (see below) calibration to blades
*R and L reading tape measures on the fence(s)
*## Maybe ## build the table as a large air cleaner using squirrel cage fan and low micron furnace filters (haven't worked this one through, yet)
*Plum in dust collection to both saws
*More light over table
*Strategically positioned T-slots for mounting
hold-downs or mitre jigs.
*Stop block on the fence
Comment