I haven't been online posting as much as usual lately as I have actually gotten the not only green light to, but the you WILL get these projects done commandment from LOML, so I have been busy getting projects going, and close at least to done...
#1. The ever lasting water heater stand project is finally in drywall, textured and I am starting on the trim. Please ignore the floor. I forgot to mask it before I sprayed the texturizer on the wall, I now need to shave the floor... What you don't see pictured is the replaced sheetrock behind the washer / dryer and the trim work that is going on there. I have one last small section to do rock wise, and trim to finish up and this room will be ready for paint, but LOML needed to wash some clothes so back in went the washer / dryer...


#2. Remodeling of the main bathroom. I have replaced the sheetrock where patches have given out (I shoved my foot through the ceiling years ago when I misstepped in the attic) and replaced the plain trim rings with some nice fancy ones we got at Home Depot.

#3. While I was at the fancy trim rings thing, in went a pair in the master bath...

What isn't pictured are the other tasks... Running to Clarks for some Pecan, moving everything off of the top of the fridge, freezer, and the top of the kitchen cabinets in order to free up the space, toting it up and hauling the goodies upstairs.
Tomorrow night will bring laundry for LOML, and milling that previously mentioned pecan. I am not entirely certain how I am going to do this though. I have a bench top jointer, and a 9' rough board I want to keep in 1 piece that needs to be S4S and thicknessed to 1/2" ASAP for a LONG threshold. Long story that will have photos posted when I am done... I either had a stroke of genius or just a stroke, not sure yet...
#1. The ever lasting water heater stand project is finally in drywall, textured and I am starting on the trim. Please ignore the floor. I forgot to mask it before I sprayed the texturizer on the wall, I now need to shave the floor... What you don't see pictured is the replaced sheetrock behind the washer / dryer and the trim work that is going on there. I have one last small section to do rock wise, and trim to finish up and this room will be ready for paint, but LOML needed to wash some clothes so back in went the washer / dryer...
#2. Remodeling of the main bathroom. I have replaced the sheetrock where patches have given out (I shoved my foot through the ceiling years ago when I misstepped in the attic) and replaced the plain trim rings with some nice fancy ones we got at Home Depot.
#3. While I was at the fancy trim rings thing, in went a pair in the master bath...
What isn't pictured are the other tasks... Running to Clarks for some Pecan, moving everything off of the top of the fridge, freezer, and the top of the kitchen cabinets in order to free up the space, toting it up and hauling the goodies upstairs.
Tomorrow night will bring laundry for LOML, and milling that previously mentioned pecan. I am not entirely certain how I am going to do this though. I have a bench top jointer, and a 9' rough board I want to keep in 1 piece that needs to be S4S and thicknessed to 1/2" ASAP for a LONG threshold. Long story that will have photos posted when I am done... I either had a stroke of genius or just a stroke, not sure yet...





Comment