Here Ya Go. Sink and toilet are in and working. Have a bit more caulking to do and I am not happy with the trim around the linen cabinet so will redo that, but otherwise it is finished. Pics of the cabinet when the trim is done and the doors are on. Am I being anal if I caulk around the PVC joints to hide the purple primer? I made sure all the lettering on the sched. 40 is towards the wall and the piping actually looks ok exposed.
The tile floor:
The sink:
The toilet:
The tile floor:
The sink:
The toilet: