Why I need a work order

Collapse
This topic is closed.
X
X
 
  • Time
  • Show
Clear All
new posts
  • LCHIEN
    Super Moderator
    • Dec 2002
    • 22047
    • Katy, TX, USA.
    • BT3000 vintage 1999

    #16
    BIL came in this weekend and we built his BBQ smaker cart, we had discussed it before, but I started drawing plans Friday at 11PM and they took it away at 7:30 PM sunday night.

    Around sunday afternoon he produced two stainless steel racks/towel hanger/handles he wanted mounted at each end... they had 4" tall brackets and I had made the apron 3.5" tall... and the width of the handle mounts were just so that they interfered with the bolts that held the apron to the legs in every possible way. He said he absolutely had to use them.. So around 6PM Sunday I came up with the "Faux" apron plan, looks like this:
    Attached Files
    Last edited by LCHIEN; 03-17-2008, 12:23 PM.
    Loring in Katy, TX USA
    If your only tool is a hammer, you tend to treat all problems as if they were nails.
    BT3 FAQ - https://www.sawdustzone.org/forum/di...sked-questions

    Comment

    Working...