Reassembled and leveled this thing by myself. I put the main structure on rollers to be able to move it. Also had to use a come along on some trees after leveling to pull it plumb - Even though it was level it was racked - before attaching the swing structure.
After I attached the swing beam to the legs I squared it up then added a temporary brace before attaching to the main structure and leveling it.
This would have gone much faster with help but everybody was busy this weekend and I was tired of it being in pieces in the yard - been there for almost a month.
There is a roof but that will either take two people or me disassembling it to get iit up there.
After I attached the swing beam to the legs I squared it up then added a temporary brace before attaching to the main structure and leveling it.
This would have gone much faster with help but everybody was busy this weekend and I was tired of it being in pieces in the yard - been there for almost a month.
There is a roof but that will either take two people or me disassembling it to get iit up there.

Took 1.5 hours to get all 26" of concrete broken up and out. 

Comment