1. Insulate and sheath the ceiling.
I finally got the OSB and insulated the walls last fall, in the whole shop, and insulated and covered the ceiling in the finishing room. Need to do the main area of the shop now.
2. Paint the walls and ceiling.
I finally got the OSB and insulated the walls last fall, in the whole shop, and insulated and covered the ceiling in the finishing room. Need to do the main area of the shop now.
2. Paint the walls and ceiling.

Comment