My plywood workdeck is in serious need of a rework. I am off this next week and that is my main objective.
One mistake was to screw through the perimeter boards into the ends of the joists instead of using joist hangers. After stripping the 3/4 PT plywood that will be fixed. I also plan to put the joists at 12" on center and sister a 2x4 at the 8' joint, giving me a full 1 1/2' under the end of each section of plywood.
The plan now is to use 3/4 (23/32) tongue and groove subfloor as the new decking. The placard on the display say weather protected applications but I am going to paint the bottom side with an oil based floor paint. The edges will get 2 coats before putting the sheets down and then the top will also get 2 coats. This should give me several years of good serviceable life. I used the moisture barrier OSB as a floor in a metal garden shed. With the foil side on the ground and the top painted with the same paint, it has held up to lawn equipment (Mowers, tractor, tiller, as well as a few gas spills) for 3-4 years.
I considered glueing down cheap sheet linoleum but was a bit worried about it getting too slick with sawdust on it. Also the plan is to eventually move the Playen to the back yard and convert it to a finishing room. The linoleum would make it difficult, if not impossible, to detach the deck from the building without detroying the plywood.
Once the work deck is done I will rent a jamb saw and cut the floor out along the walls inside to adjust joists and fix some uneven areas in there. The floor framing was covered with plywood and the walls built on top of it so I can't remove the plywood in full sheets. Haven't decided yet if I am going to go with the T&G inside or reuse some of the existing plywood. Either way, it has to be basically a one day job to get the tools back under lock and key. (Either that or I camp out one night with my girl
....)
One mistake was to screw through the perimeter boards into the ends of the joists instead of using joist hangers. After stripping the 3/4 PT plywood that will be fixed. I also plan to put the joists at 12" on center and sister a 2x4 at the 8' joint, giving me a full 1 1/2' under the end of each section of plywood.
The plan now is to use 3/4 (23/32) tongue and groove subfloor as the new decking. The placard on the display say weather protected applications but I am going to paint the bottom side with an oil based floor paint. The edges will get 2 coats before putting the sheets down and then the top will also get 2 coats. This should give me several years of good serviceable life. I used the moisture barrier OSB as a floor in a metal garden shed. With the foil side on the ground and the top painted with the same paint, it has held up to lawn equipment (Mowers, tractor, tiller, as well as a few gas spills) for 3-4 years.
I considered glueing down cheap sheet linoleum but was a bit worried about it getting too slick with sawdust on it. Also the plan is to eventually move the Playen to the back yard and convert it to a finishing room. The linoleum would make it difficult, if not impossible, to detach the deck from the building without detroying the plywood.
Once the work deck is done I will rent a jamb saw and cut the floor out along the walls inside to adjust joists and fix some uneven areas in there. The floor framing was covered with plywood and the walls built on top of it so I can't remove the plywood in full sheets. Haven't decided yet if I am going to go with the T&G inside or reuse some of the existing plywood. Either way, it has to be basically a one day job to get the tools back under lock and key. (Either that or I camp out one night with my girl
....)