Started new thread since I had to delete the Pics from the old one. Its been a while since I posted, no pics this time as not much has changed in the appearance of the house.
On Thursday we passed the rough electrical, rough plumbing and framing on the house. So now its on to insulation, drywall and siding on the house. The winter snows cost us 2 months of lost work but now the weather is great again.
Passed the final inspection on the garage but the Inspector won't sign it off until the final is passed on the house.
We have six minor corrections to do from this last inspection on the house but the inspector is allowing us to continue as if we have already corrected these issues. Great guy who is really interested in helping us. I believe its because we are doing all the work ourselves.
I'll post a few pics of the garage when I get a chance.
On Thursday we passed the rough electrical, rough plumbing and framing on the house. So now its on to insulation, drywall and siding on the house. The winter snows cost us 2 months of lost work but now the weather is great again.
Passed the final inspection on the garage but the Inspector won't sign it off until the final is passed on the house.
We have six minor corrections to do from this last inspection on the house but the inspector is allowing us to continue as if we have already corrected these issues. Great guy who is really interested in helping us. I believe its because we are doing all the work ourselves.
I'll post a few pics of the garage when I get a chance.