This waiting room took about 800 bf of T&G pecky cypress, for the walls, door jambs, caseing, door faces, window jamb and caseing, base moulding, bench bases and soffit around the room. Other than fabricating all the moulding in the shop, everything else was built on the job. It took a little longer than I first planned because there was no power the first week there. Had to work off my generator, and portable lights.