Just had the 3rd company here for an estimate (the first one kinda flaked out in contacting me, got an estimate from the second and now want another estimate).
Waiting to hear what this one comes back at, but at least it is with a company that has been here for at least 40 years which gives me a better comfort level.
Reviewed what needs to be done before spraying, so I still have a bit of work to get things tightened up.
Electrical panel is supposed to be installed sometime next week, so then as soon as I can get the power company here to pull the line between the transformer and the shop I should be up and running. Will have the electric shop heater going as soon as temps look like they will get into the 40's and then (hopefully) contact one of the two companies to see who can get here to start spraying foam.
Dagnabbit, I am determined to get working in the shop this winter, but power and insulation keep slowing me down.
Waiting to hear what this one comes back at, but at least it is with a company that has been here for at least 40 years which gives me a better comfort level.
Reviewed what needs to be done before spraying, so I still have a bit of work to get things tightened up.
Electrical panel is supposed to be installed sometime next week, so then as soon as I can get the power company here to pull the line between the transformer and the shop I should be up and running. Will have the electric shop heater going as soon as temps look like they will get into the 40's and then (hopefully) contact one of the two companies to see who can get here to start spraying foam.
Dagnabbit, I am determined to get working in the shop this winter, but power and insulation keep slowing me down.
Comment