Well, I got the lumber ripped crosscut and drilled for the basic HF mobile base tonight. Tomorrow will be the 2 layers of 3/4 plywood cut and glued (I need to get some ply, I'm out of anything big enough...)...
Not compatible with the 2x6 challenge, but a worthwhile project, and something I have been putting off FAR too long...
That's one more junk box I can get rid of!
Not compatible with the 2x6 challenge, but a worthwhile project, and something I have been putting off FAR too long...
That's one more junk box I can get rid of!