Due to some minor financial setbacks it is going top be at least this Fall before I can afford to pour the slab for the new building. With that in mind I needed to clear the floor by tearing out the existing shelves and building cabinets along 2 walls.
The bad news is that working around carrying mail and the Texas HEAT (Had a cool spell Friday and Saturday to usher in Summer - only got to the mid and high 90's each day!) everything except required yard work has been on hold for several weeks.
On the plus side, it is forcing me to "clean house". I have gone thru everything except the cut offs and eliminated a bunch of junk. Hopefully I will get the wood gone thru today and solve the rest of the storage problems. Still need to work on a place for jigs and a few tools that stay in their cases.
Old shelving...
New storage/cabinets...
Hopefully I will get all the pictures into a Webshots album later today and can post a link for those interested.
The bad news is that working around carrying mail and the Texas HEAT (Had a cool spell Friday and Saturday to usher in Summer - only got to the mid and high 90's each day!) everything except required yard work has been on hold for several weeks.
On the plus side, it is forcing me to "clean house". I have gone thru everything except the cut offs and eliminated a bunch of junk. Hopefully I will get the wood gone thru today and solve the rest of the storage problems. Still need to work on a place for jigs and a few tools that stay in their cases.
Old shelving...
New storage/cabinets...
Hopefully I will get all the pictures into a Webshots album later today and can post a link for those interested.
Comment